Technip, through its Norwegian affiliate Technip Offshore Norge AS, has been awarded by
Statoil an installation contract for the infield flowlines, service lines and umbilicals at the
Snøhvit field. The contract, worth over EUR 65 million, includes the installation
of 13%Cr infield flowlines (17km, 14â?), installation of a CO2 pipeline (150km, 8â?), two off-service lines (143kmeach, 4â?) from Melkøya to Snøhvit, umbilicals (170km) infield and from
Melkøya to Snøhvit, spool installation and tie-ins. All linepipe and umbilicals are supplied by
Statoil. The infield lines will be installed and tied-in during 2004 and the remainder of the
installation will be performed in 2005.The project management and engineering for the work will be performed in Oslo, Norway, and the fabrication of the pipelines will take place at Technipâs welding base in Orkanger, Norway, and possibly Evanton, Scotland. Several of the Technipâs vessels will be used for the offshore installation activities.
Looking for more projects or tenders?
Subscribe to our Project Preview Newsletter