Foster Wheeler wins upgrade project

Foster Wheeler Ltd. announced that its subsidiary Foster Wheeler Iberia, S. A. was awarded a contract by BP Oil Refineria de Castellon, S.A. to upgrade part of its 120,000 barrels per stream day (BPSD) Castellon refinery in Spain to produce ultra-low sulfur fuels. The project is valued at approximately $100 million. Foster Wheeler will be responsible for the engineering, equipment and material procurement, and construction supervision for the project, which is scheduled for mechanical completion in mid-2004. The project, part of BP’s Ultimate Generation Fuels program, includes the installation of a new diesel hydrotreater, a hydrogen plant, and a naphtha hydrotreater. Foster Wheeler also will revamp the existing distillation, heavy/light gas oil, MEA regeneration and sour water stripper units, as well as the main utilities, including DCS and electricity. The project will be managed by Foster Wheeler with the participation of Technip for the hydrogen plant and utilities.

Previous articleNatural gas pipeline proposal
Next articleDrilling contract for Schlumberger
Stainless Steel World Publisher
Stainless Steel World is part of The KCI Media Group, a group of companies focused on building and sustaining global communities in the flow control industries. We publish news on a daily basis and connect business-to-business professionals through our online communities, publications, conferences and exhibitions.