The Stockholm Waterfront project’s Congress Centre will incorporate a spectacular stainless steel façade, provided by Outokumpu. The building will meet high environmental standards with regards to energy efficiency and sustainability. The Congress Centre façade will be a double structure, in which the building is encased in a screen built from Z-shaped stainless profiles. The material will be Outokumpu’s duplex stainless steel with a half-matte surface to provide the desired level of reflectivity. Outokumpu has also provided stainless fingerprint-resistant steel for inside door and window frames. The Stockholm Waterfront project emphasizes energy-efficiency and sustainable materials. The Stockholm Waterfront will be situated in central Stockholm, overlooking the City Hall and the bay Riddarfjärden. The project is scheduled for completion in December 2010.