Technip has been awarded an engineering, procurement and construction contract by Chevron for delivery of the Spar hull and mooring systems for the deepwater Tahiti field development project. Chevron has also awarded Technip a contract for the fabrication of the topsides modules. The Tahiti field is located in the Gulf of Mexico in Green Canyon blocks 596, 597, 640 and 641 in 4,200 feet of water, approximately 190m SW of New Orleans (Louisiana). The Tahiti facility will have the capacity to produce 125,000BOPD of oil and 70MMSCFPD of gas and treat 120,000BWPD of produced water. The topsides facility will be comprised of a 9,950-ton production module, 6,500-ton utility module and a 2,500-ton module support frame. The topsides will be supported by the Technip designed deepwater Spar hull that will be 170m long, with a diameter of 39m and a steel weight of 24,000mt. The detailed hull and moorings design, procurement and fabrication will be carried out by Technip’s yard in Pori (Finland). The fabrication of the topsides by Gulf Marine fabricators, the Group’s yard located near Corpus Christi (Texas), is scheduled to begin in Q4 2005. Delivery of the Spar hull to the Gulf of Mexico and fabrication of the topsides is scheduled for completion in mid-2007.
Looking for more projects or tenders? This is just the tip of the iceberg! Subscribe to our Projects & Tenders newsletter. If the above link does not work, please visit the following website: www.projectsandtenders.com