TotalEnergies has signed a Heads of Agreement (HOA) with Sempra Infrastructure, Mitsui & Co., Ltd. and Japan LNG Investment for the expansion of Cameron LNG, a liquefied natural gas (LNG) production and export facility located in Louisiana, U.S. This expansion project includes the development of a fourth train with a production capacity of 6.75 million metric tons per annum (Mtpa), and a 5% increase of the current 13.5 Mtpa first three trains through debottlenecking. It will also include design enhancements aiming at reducing the emissions of the facility, including electric drive technology. Under the terms of the HOA, TotalEnergies will offtake 16.6% of the projected fourth train’s production capacity, and 25% of the projected debottlenecked capacity. Additionally, Cameron LNG advances the development of this project with the selection of two contractors to conduct a competitive Front End Engineering Design (FEED) in view of the selection of the Engineering, Procurement and Construction (EPC) contractor.
Development of the Cameron LNG expansion project remains subject to definitive agreements, obtaining the necessary permits, and all partners reaching a final investment decision planned for 2023.