Tag: Lensk

Pipe supply for Power of Siberia GTS begins

Gazprom delivered first pipes for the Power of Siberia gas transmission system (GTS) to Lensk (Yakutia). The first batch consists of 260 pipes with a length of 1,420mm, wall thickness of 21.7mm and total weight of some 2400 tons.