SNC-Lavalin announced that its wholly-owned subsidiary Candu Energy Inc., has been awarded three contracts with a combined value of USD 34M from Bruce Power for projects in support of the Major Component Replacement (MCR) program.
SNC-Lavalin’s scope of services includes fuel channel and feeder replacement (FCFR) detailed designs for Unit 3 and Unit 4 and a seismic margin assessment (SMA) of the site. The three contracts are within SNCL Engineering Services. The services will extend the life of the reactors until 2064.
SNC-Lavalin will undertake the detailed design of the Unit 3 and Unit 4 MCR fuel channel assemblies and calandria tubes, including pressure tubes, end fittings, positioning assemblies, bearing and shielding sleeves and inserts and rolled joints. The work has begun and is anticipated to be completed in 2023.