Primetals Technologies receives PAC from ArcelorMittal

Primetals Technologies has received the Provisional Acceptance Certificate (PAC) from ArcelorMittal Poland S.A. for the replacement of the second LD(BOF) converter at its Dąbrowa Górnicza steel works. Like its counterpart, Converter #1 – already replaced by Primetals Technologies and commissioned in November 2016 – Converter #3 was a turnkey construction. Its replacement had already been agreed as an option in the third quarter of 2015. The second converter will also be suspended by the maintenance-free Vaicon Link 2.0 which not only has a long service life but also minimizes the stresses caused by thermal deformations.
The converters previously used in the Dąbrowa Górnicza steel works had reached the end of their life cycles. As in the case of Converter #1, Primetals Technologies supplied the vessel and the trunnion ring, including the maintenance-free Vaicon Link 2.0 suspension, for Converter #3. The converter bearings and the enclosure have also been renewed. The order included also removal of the existing vessel and assembly and installation of the new equipment. This had been handled by ZKS Ferrum S.A., the Polish partner in the consortium.
Previous articleEni announces the start-up of second production unit
Next articleUS Cove Point LNG starts commercial operation
Stainless Steel World Publisher
Stainless Steel World is part of The KCI Media Group, a group of companies focused on building and sustaining global communities in the flow control industries. We publish news on a daily basis and connect business-to-business professionals through our online communities, publications, conferences and exhibitions.