The planned development will consist of approximately 34 producing wells, including eleven existing wells and approximately 23 new wells, flow-lines and a common gathering trunk-line to transport the well fluids to the central gas oil separation facility for primary treatment. After separation, the oil and gas produced will be exported through new pipelines that will be connected into existing pipelines carrying products to the Mellitah delivery terminal, in the northwest of Libya, on the Mediterranean Sea, for export. The planned design capacity of the gas oil separation facility is 50,000 barrels per day (BPD) of oil, 90MMSCF per day of gas and associated water (to be re-injected into the reservoirs).
Foster Wheeler announced that a subsidiary of its Global Engineering and Construction Group, in joint venture with Taknia Libya Engineering Company (Taknia), has been awarded a front-end engineering design (FEED) contract by Nafusah Oil Operations, Libyan Branch, for an onshore oilfield development, known as the Area 47 Development Project in Libya. Area 47 (North Hamada Field) is located in the Hamada region, approximately 200km south of Tripoli, in the Ghadames Basin. The value of the contract was not disclosed.