Fluor Corporation was selected by BP Trinidad and Tobago (BP) to perform the front-end engineering and design (FEED) for the Cassia Compression Project off the east coast of Trinidad and Tobago. Fluor booked the undisclosed contract value into backlog in the Q1 2017.
Fluor’s scope includes the design of a new offshore gas compression platform, new connecting bridge and modifications to the existing Cassia hub. The platform will compress gas produced from the existing Cassia platforms.
FEED activities are expected to be completed in 2017 with first gas expected in 2020.