Essar Oil and Gas Exploration and Production Ltd (EOGEPL) announced its investment in Microbial eCBM technology to boost CBM production.
EOGEPL has collaborated with The Energy & Resources Institute (TERI) and ONGC Energy Centre (OEC) to establish the potential of eCBM Microbial technology in the Raniganj-East Block of the company. The feasibility test of the technique has been completed in collaboration with TERI-OEC, and in parallel R&D is ongoing for full-field application.
After extensive study, eCBM Microbial stimulation has been completed in five wells of Raniganj-East Block of the Company. These wells will be monitored for the coming three to six months, and based on the results, along with final optimization of design, EOGEPL will implement the technology at large scale to maximize gas yield and improve the reserves base.
The Microbial Treatment is one of the “Enhanced Recovery Methods” used in the oil & gas industry to increase reserves. With the introduction of the Microbial Stimulation Technology, an upsurge in production of CBM gas is expected, while improving the reserve base by up to 10%.