ArcelorMittal Ostrava to invest in new boiler

ArcelorMittal Ostrava is to build a new boiler as part of a USD 150M modernisation programme for the steelmaker’s power plant. Through its subsidiary ArcelorMittal Energy, a contract has been signed with Finland’s Valmet to install a fluidised bed boiler worth USD 74M, replacing four coal-fired boilers. The new boiler, which is more energy-efficient, will significantly reduce emissions of sulphur dioxide, nitrogen oxides and dust.
Along with the site’s ongoing desulphurisation programme and its project to reduce nitrogen oxides, the new boiler is a part of the overall modernisation of Ostrava’s power plant. These investments will help reduce the company´s environmental footprint and ensure its power plant will comply with the European emission limits before they come into effect.
 

The circulating fluidised bed boiler from Valmet will be installed and operational within three years. The fluidised bed boiler burns coal more efficiently than the current coal fired boilers and has a guaranteed efficiency of more than 92%, while producing very low emissions. It is equipped with facilities for desulphurisation and reduction of nitrogen oxides emissions. All coal-fired boilers at the Ostrava power plant are being either replaced or overhauled. While the turnkey boiler project will be realised by Valmet, the desulphurisation and the de-nitrification facilities will be delivered by a number of Czech companies.

Previous articleTenaris extends NKKTUBES JV agreement term
Next articleBarrett steel boosts investment by another GBP 1M
Stainless Steel World Publisher
Stainless Steel World is part of The KCI Media Group, a group of companies focused on building and sustaining global communities in the flow control industries. We publish news on a daily basis and connect business-to-business professionals through our online communities, publications, conferences and exhibitions.