Aker wins 20-year corder with Chevron

Aker Solutions has entered a master agreement to provide umbilicals for Chevron-operated oil and gas fields in the US Gulf of Mexico. The company also secured the first work order under the new master agreement, to provide 24 km (15 miles) of umbilicals for Chevron’s Anchor project. 
The scope of the Chevron agreement includes the delivery of engineering, design, and manufacturing of dynamic and static control umbilicals, dynamic and static power umbilicals, and service and installation support.
This agreement lays the foundation for a long-term collaborative relationship incentivizing both Chevron and Aker Solutions to jointly improve long-term performance both technically and commercially through multi-project synergies, execution excellence and repeatability, and life-of-field thinking.
Aker Solutions was at the same time awarded the first work order under the Chevron master order for the Anchor project in the US Gulf of Mexico. The scope includes about 24 km (15 miles) of 20,000 psi dynamic steel tube- and power umbilicals and distribution equipment. The deepwater field is located approximately 225 km (140 miles) offshore Louisiana at a water depth of 1,524 meters (5,000 feet).
Aker Solutions’ facility in Mobile, Alabama in the United States will perform the engineering, design, and manufacturing of the umbilicals. The work will start up immediately.
The contract will be booked as order intake in the first quarter of 2020.
Previous articleAMETEK meets the demand for life-saving devices
Next articleChazen elected by Occidental as Chairman of the Board
Stainless Steel World Publisher
Stainless Steel World is part of The KCI Media Group, a group of companies focused on building and sustaining global communities in the flow control industries. We publish news on a daily basis and connect business-to-business professionals through our online communities, publications, conferences and exhibitions.