ABB has won an order worth USD 62 million from Vale to supply electrification and automation systems and related equipment for a new iron ore pellet plant in Oman. The new Vale plant, 230km NW of Muscat, is expected to produce up to 10 million tonnes of iron ore pellets per year. Scheduled to start operations at the end of 2010, the facility will provide the Middle East region with iron ore and pellets for the steel industry. ABB will provide complete electrification and automation solutions for the plant to maximize productivity, monitor energy use and minimize energy consumption. The scope of supply includes ABB’s extended automation system 800xA for process control and system integration, a collaborative production management system, all medium voltage and low voltage power distribution systems, transformers, drives, motors, and other auxiliary equipment, as well as the substation infrastructure and engineering.