LUKOIL completes installation at Korchagin

LUKOIL has completed the installation of the wellhead platform’s topside as part of the Yury Korchagin field Phase 2 development in the Russian sector of the Caspian Sea.

The wellhead platform is a satellite platform designed to drill wells in the eastern part of the field. Drilling at Phase 2 is expected to start in May, 2018. Apart from the process equipment, the platform is equipped with the safety systems, living quarters for the personnel’s temporary stay and a helideck. As most of the operations are automated, only eight workspaces are designed for the temporary stay of the personnel. Produced oil and gas will be transported to the host platform through the subsea pipelines and treated for the delivery onshore.

Previous articleSandvik reports ‘positive mood’ at Tube 2018
Next articlePetrolia welcomes new director & chairman
Stainless Steel World Publisher
Stainless Steel World is part of The KCI Media Group, a group of companies focused on building and sustaining global communities in the flow control industries. We publish news on a daily basis and connect business-to-business professionals through our online communities, publications, conferences and exhibitions.