ArcelorMittal steel in floating windfarm

The ArcelorMittal naval heavy plates, produced in Gijón, Spain, in grades NV36D and NV36E will soon be used to construct five floating windfarm structures, which will be located at Buchan Deep some 25 km east of Peterhead. Joint venture Navantia-Windar has selected ArcelorMittal as its steel supplier for the project because the company offered several key customer benefits. The contract was awarded by Statoil subsidiary Hywind Scotland Ltd.


Photo courtesy by Ian Dick

Luis Rodrí­guez Hevia, of ArcelorMittal Asturias’ commercial department, said: “Several factors made ArcelorMittal the ideal supplier for this project: our proximity to the customer’s premises, our short delivery times, the quality of our steels, and our ability to react quickly to the unforeseen challenges that are possible with a project of this size and scaleâ€?.

Weighing 3,500 tonnes, the windfarm structures are large steel cylinders that extend some 100m beneath the sea surface each attached to the seabed in a mooring system. Delivery of the heavy plate by ArcelorMittal’s Gijón site began in December 2015 and will be completed in May 2016.
Previous articleABB to connect offshore windfarm to Belgian
Next articleAlcoa to supply metal parts for Airbus
Stainless Steel World Publisher
Stainless Steel World is part of The KCI Media Group, a group of companies focused on building and sustaining global communities in the flow control industries. We publish news on a daily basis and connect business-to-business professionals through our online communities, publications, conferences and exhibitions.